Building Work
Jan 2008 The Scout Hut roof was replaced along with the fascia and guttering plus the major cracks were stitched up.
2007 - Internal walls were re-painted
2006 - 2007 The main drain pipe was replaced and new soak-aways were installed on both sides on the Scout Hut.
|